ApprovedThe city approved it. Building permits come next.

701 S Myrtle

Blake Griggs Properties plans 204 apartments over ground-floor retail at Myrtle and Olive in Old Town Monrovia, replacing a 1979 office park. The City Council approved it 5-0 in December 2025.

Units

204

Affordable units

20 units (17 low-income, 3 moderate-income), via state density bonus

Site area

1.61 acres

Details

Address
701 S Myrtle Avenue, Monrovia, CA 91016
Stories
5 stories / 65 ft
Unit mix
20 studios, 147 one-bedroom, 37 two-bedroom
Parking
329 spaces, two subterranean levels
CEQA
Environmental Impact Report certified; Notice of Determination filed December 4, 2025 (SCH 2023120051)
Replaces
The 1979 Myrtle Olive Business Park, a 1.61-acre office site at the southwest corner of Myrtle and Olive
Hearing body
Monrovia City Council
Ground floor
~2,370 sq ft retail plus a 2,782 sq ft fitness center
Council vote
5-0
Amenities
25,000+ sq ft of resident amenities
Former name
The Monroe (renamed mid-2025)
Entitlements
General Plan Amendment, Zoning Code Amendment, Specific Plan, Vesting Tentative Parcel Map, Conditional Use Permit
Approval
City Council approved 5-0, 2025-12-02 (General Plan Amendment, Zoning Code Amendment, Specific Plan, Vesting Tentative Parcel Map, and Conditional Use Permit; formal resolution number not yet published — see city project page and the CEQA Notice of Determination, SCH 2023120051)

Monrovia's City Council has approved a 204-unit mixed-use building at the southwest corner of Myrtle and Olive, in the city's Old Town Extension District. The project replaces a 1.61-acre office site with five stories of apartments over ground-floor retail and underground parking. The council voted 5-0 to approve it in December 2025, after a two-year environmental review.

What's proposed

Blake Griggs Properties would build 204 apartments: 20 studios, 147 one-bedrooms, and 37 two-bedrooms. Twenty of them are set aside as affordable under the state density bonus (17 low-income, 3 moderate-income). The ground floor adds about 2,370 square feet of retail space and a 2,782-square-foot fitness center, and residents get more than 25,000 square feet of shared amenities. Parking is underground: 329 spaces across two subterranean levels. The project was earlier called The Monroe; it was renamed in mid-2025.

The building is designed by AO Architects, who also announced the project on their own site. A rendering is available on the developer's project page and in AO's own project announcement.

The site and the entitlements

The project sits in Monrovia's Old Town Extension District, within the city's Specific Plan framework, on the site of the existing 1979 Myrtle Olive Business Park. Because the existing zoning and general plan designation didn't allow a building this size, the approval package was unusually layered: a General Plan Amendment, a Zoning Code Amendment, a Specific Plan, a Vesting Tentative Parcel Map, and a Conditional Use Permit, all adopted together on December 2, 2025.

The city certified an Environmental Impact Report for the project, a more thorough review than the Mitigated Negative Declaration most SGV infill projects use, and filed its Notice of Determination on December 4, 2025.

Why this one matters

Old Town Monrovia has filled in steadily with housing near the Metro A Line station. 701 S. Myrtle replaces an office park with apartments, and the city had to change both its general plan and its zoning code to allow it. The council approved it 5-0 after a full environmental review. The next milestone to watch is a building permit.

What this means if you live nearby

The approval is final; nothing is under construction yet. The developer's own timeline puts the start of construction roughly 12 to 15 months after the December 2025 approval, which points to early 2027, followed by a 26 to 30 month build. Expect the next visible step to be demolition of the existing office buildings once permits are pulled, which hadn't happened as of this write-up.

Timeline

  1. Proposed

    Notice of Preparation circulated

    The city circulated a Notice of Preparation for an environmental impact report on a mixed-use redevelopment of the 1.61-acre office site, then described as roughly 200 units plus retail.

    Source: ceqanet.lci.ca.gov
  2. Under review

    Draft EIR published

    The Draft Environmental Impact Report for the 701 S. Myrtle Specific Plan and Development Project was released for public review.

    Source: ceqanet.lci.ca.gov
  3. Under review

    Planning Commission hearing

    The Planning Commission considered the Specific Plan, the project's entitlements, and EIR certification, and recommended City Council approval with conditions including a landscape review by the city's design review committee.

    Source: monroviaca.gov
  4. Approved

    City Council approves the project, 5-0

    The City Council unanimously approved a General Plan Amendment, Zoning Code Amendment, Specific Plan, Vesting Tentative Parcel Map, and Conditional Use Permit for 204 units (20 affordable), about 2,370 sq ft of retail, and a fitness center.

    Source: monroviaca.gov
  5. Approved

    Notice of Determination filed

    The city filed its CEQA Notice of Determination for the approved project under SCH 2023120051.

    Source: ceqanet.lci.ca.gov

Team

Source (city project page): monroviaca.gov ↗ · retrieved · last verified