Fairview Court
A full city block a block from the Metro A Line, entitled in 2022 for 108 condominiums and the adaptive reuse of two 1920s school buildings. The commercial half is open and leased; the housing half has not applied for a building permit.
Units
108
Affordable units
19 of 108
Site area
~1.9 acres — a full city block
Details
- Address
- 1020 El Centro Street, South Pasadena, CA 91030
- Case number
- Project No. 2441 (COA-DRX-DBR-AHR-CUP-TTM-SIGN-TRP)
- APN
- 5315-008-047 (and related)
- Site bounds
- Mission St (north), Fairview Ave (east), Diamond Ave (west), El Centro St (south)
- Stories
- 4 (density-bonus concession from a 2-story base)
- Parking
- Two levels of subterranean parking
- Commercial
- Adaptive reuse of the historic school buildings (~11,435 sq ft) plus new ground-floor retail. Total commercial cited between ~10,597 and 22,032 sq ft depending on document phase
- Historic resources
- 1920s former South Pasadena School District administration building and auditorium, retained and adaptively reused
- New construction
- Five new four-story buildings
- Entitlements
- Certificate of Appropriateness, Design Review, Density Bonus Review, Affordable Housing Review, Conditional Use Permit, Tentative Tract Map, Sign Program, Tree Removal Permit
- State law
- State Density Bonus Law — FAR and story incentives
- CEQA status
- Class 32 categorical exemption (In-Fill Development), SCH 2022090234, posted 2022-09-14
- Hearings
- 2022-09-13 South Pasadena Planning Commission; Cultural Heritage Commission recommended approval 2022-08-18
- Commission vote
- 3-0-1 (one recusal), Planning Commission
- Transit
- One block from the South Pasadena Metro A Line station
- Commercial tenants
- Sid the Cat Auditorium (~500-capacity live music venue, opened November 2025); Villa's Tacos, The Boy & the Bear, Lit Brew opening on a rolling basis
- Residential permit status
- Pending building permit application, no anticipated submittal date per the city project summary
- Acquisition price
- ~$12.5 million (2021)
- Landscape architect
- Studio-MLA (Mia Lehrer, FASLA; Dawn Dyer)
- Applicant
- FSM Sopas, LLC / FYM Sopas, LLC (Brian and Yonah Drog; Ayahlushim Getachew)
What was approved
One hundred and eight condominiums — studios, one-bedrooms, and two-bedrooms — in five new four-story buildings, with two levels of subterranean parking beneath. The counts by bedroom type are not in the reviewed documents. Nineteen of the 108 are affordable. At roughly 18 percent that is a substantially deeper set-aside than the density-bonus minimums being taken elsewhere in the valley — San Gabriel's 824 S. Gladys traded 5 percent, and 815 Fremont, a few blocks from here, traded 10 percent at the moderate tier. What the bonus bought was height and bulk. The base zoning allows two stories; the density bonus incentives delivered four, along with additional floor area ratio. In South Pasadena, going from two stories to four on a full block is not a small concession. The historic buildings stay. The 1920s administration building and auditorium are retained and adaptively reused, which required a Certificate of Appropriateness — the approval a city issues for work on a designated historic resource, confirming the changes are compatible with what makes it significant.
The design team
This is a project where the team is worth naming, because it is stronger than the average valley infill file. Gangi Architects is the architect, with Mark Gangi, FAIA, on the record. The developer is Gangi Development, led by Frank Gangi. Landscape is Studio-MLA — Mia Lehrer, FASLA, with Dawn Dyer — a firm whose work runs to the LA River master planning and major civic landscape projects. A studio-quality landscape architect on a 1.9-acre mixed-use block, organized around a central plaza, suggests the public realm was treated as the point rather than as leftover space between buildings. The applicant of record is FSM Sopas, LLC, appearing in some documents as FYM Sopas, LLC, associated with Brian and Yonah Drog and Ayahlushim Getachew. Like most single-purpose entities it reveals little; the operating relationship between it and Gangi Development is not fully established in the public record.
The site
A full city block bounded by Mission Street, Fairview Avenue, Diamond Avenue, and El Centro Street, one block from the South Pasadena Metro A Line station. The South Pasadena Unified School District sold the site in 2021 for approximately $12.5 million. Surplus school district property is one of the more productive sources of large infill parcels in the valley right now — Duarte's Crestfield Townhomes, 169 homes on a closed elementary school, is the same category of transaction with a different structure. The block sits inside a cluster of Metro-adjacent mixed-use activity in downtown South Pasadena. Arbor Square at 815 Fremont, 56 condominiums, is entitled and listed for sale. Mission Bell and Seven Patios are also in the vicinity. For a city with a reputation for resisting development, the station area is doing real work.
Timeline
- 2021-04-10 — FSM Sopas, LLC acquires the former school district site for about $12.5 million, with Frank Gangi of Gangi Development identified as developer. The LA Business Journal's July 2021 piece reported on the sale two months after it closed.
- 2022-08-18 — Cultural Heritage Commission reviews the project and recommends approval to the Planning Commission.
- 2022-09-13 — Planning Commission approves Project No. 2441 on a 3-0-1 vote, one recusal.
- 2022-09-14 — Notice of Exemption posted under CEQA Guidelines section 15332.
- 2025-11 — Adaptive reuse of the historic buildings completes. Sid the Cat Auditorium opens as the first major commercial tenant.
How it got here
The entitlement package is one of the longest in the current pipeline: a Certificate of Appropriateness, Design Review, Density Bonus Review, Affordable Housing Review, a Conditional Use Permit, a Tentative Tract Map, a Sign Program, and a Tree Removal Permit — all under Project No. 2441. That length is what a historic full-block mixed-use project costs procedurally. Each permit answers a different question: the COA covers the historic buildings, the CUP covers uses the zoning allows only with review, the tract map creates the salable condominium lots, and the density bonus reviews handle the affordable units and the incentives traded for them. CEQA was a Class 32 categorical exemption for in-fill development, SCH 2022090234. It is the same exemption Arcadia used on the Colorado Collection, and a different route than the ministerial finding South Pasadena made three years later on 815 Fremont — worth noting that the same city took two different paths on two downtown projects. The Planning Commission vote was 3-0-1, with one commissioner recused.
Where it stands
Split. Commercial complete and operating; residential entitled and dormant. The city's project summary describes the residential component as pending a building permit application with no anticipated submittal date. That phrasing is unusually blunt for a municipal document, and it should be read plainly: as of the most recent project sheet, the developer has not told the city when it intends to file. Portions of the site have been marketed for sale as a leased commercial asset. A completed, tenanted commercial component is a financeable thing on its own, and separating it from an unbuilt residential entitlement is a rational move — but it is also how a housing component ends up indefinitely deferred.
What this signals
Entitled housing and delivered housing are different inventories. This project has been counted as 108 approved units in South Pasadena's pipeline since 2022. Zero of them exist, and the city says no permit application is scheduled. Anyone reading approval totals as supply should discount them by whatever this pattern turns out to be worth — and Fairview Court is now the second South Pasadena file on this board in that condition, alongside 815 Fremont, which is entitled and listed rather than built. The commercial half went first, and that is not an accident: adaptive reuse of two historic buildings into a music venue and food hall is faster, cheaper, and financeable against signed leases. Four-story new construction over subterranean parking is none of those things at current costs. When a mixed-use approval lets the phases move independently, the phase that pencils moves and the other waits. And nineteen affordable units out of 108 is the deepest set-aside in the current tracked pipeline — it bought a doubling of allowed height on a full block in a preservation-minded city. That exchange rate is the single most useful number here for anyone holding land near the A Line.
What this means if you live nearby
The block is open and active. Sid the Cat is programming live music in the old auditorium; food and drink tenants are opening through the year. The historic buildings were kept. The 108 condominiums are approved but unscheduled. There is no construction start to plan around, and the city has not been given a filing date.
Team
Source (ceqa-notice): https://ceqanet.lci.ca.gov/2022090234 · retrieved 2026-08-12 · last verified 2026-08-12
Advisory Desk
Own property in South Pasadena?
Get a preliminary read on what your parcel can support — zoning, density, and feasibility, grounded in local land-use data. No obligation, no sales pitch.